2025-07-01 08:56

Port of Los Angeles Completes Construction of Berths 177-182 Wharf Restoration Project



The Port of Los Angeles has completed construction of the $22.7 million Berths 177-182 Wharf Restoration project located along the East Basin Channel in Wilmington. Approved by the Los Angeles Board of Harbor Commissioners in September 2023, the project began construction in November 2023, and included constructing approximately 382 linear feet of concrete wharf, 62-feet-wide. Work also includes slope erosion repair and bollard upgrades.

The new wharf, designed in compliance with the Port’s seismic code, partially replaced a timber wharf that was extensively damaged in a fire that occurred in 2014. “The completion of this project on the heels of the catastrophic Eaton and Palisades fires is a stark reminder of the need to rebuild with long-term resiliency as a top priority,” said Port of Los Angeles Executive Director Gene Seroka. “We’re proud to deliver this key infrastructure project as steel-handling operations remain uninterrupted.” “Designing and building infrastructure with fire prevention in mind is critical to our operations,” said Port of Los Angeles Deputy Executive Director of Development Dina Aryan-Zahlan. “This Port is more than 100 years old; terminal modernization is essential to maintain our competitive edge.”

The project allows terminal operator Pasha Stevedoring & Terminals to continue shipping and receiving of steel products, including coils of sheet metal and wire rods, tubing, piping, rebar and other bulk material. Pasha’s terminal is a specialized 40-acre steel-handling facility with covered on-dock warehouses that comprise a 116,000 square-foot transit shed. The Port of Los Angeles is the largest steel-handling port on the West Coast.

Pasha operates two marine terminals at the Port of Los Angeles, including the site of the Green Omni Terminal Project, which demonstrates a full range of zero- and near-zero emissions equipment and vehicles. Construction was completed by Reyes/Larison Joint Venture of Pomona, Calif. 
 

< Korea Shipping Gazette >

로그인 후 작성 가능합니다.

0/250

확인
맨위로
맨위로

선박운항스케줄

인기 스케줄

  • PYEONGTAEK XINGANG

    선박운항스케줄 목록 - 선박운항스케줄목록으로 Vessel, D-Date, A-Date, Agent를 나타내는 테이블입니다.
    Vessel D-Date A-Date Agent
    Nagoya Trader 07/09 07/10 Sinokor
    Nagoya Trader 07/11 07/13 Dong Young
    Nagoya Trader 07/11 07/13 EAS SHIPPING KOREA
  • BUSAN ISTANBUL

    선박운항스케줄 목록 - 선박운항스케줄목록으로 Vessel, D-Date, A-Date, Agent를 나타내는 테이블입니다.
    Vessel D-Date A-Date Agent
    Gsl Grania 07/11 08/30 BEN LINE
    Northern Monument 07/13 08/21 SEA LEAD SHIPPING
    Msc Zoe 07/14 09/07 HMM
  • BUSAN QINHUANGDAO

    선박운항스케줄 목록 - 선박운항스케줄목록으로 Vessel, D-Date, A-Date, Agent를 나타내는 테이블입니다.
    Vessel D-Date A-Date Agent
    Easline Osaka 07/09 07/15 EAS SHIPPING KOREA
    Easline Lianyungang 07/13 07/18 EAS SHIPPING KOREA
    Easline Osaka 07/16 07/22 EAS SHIPPING KOREA
  • BUSAN MELBOURNE

    선박운항스케줄 목록 - 선박운항스케줄목록으로 Vessel, D-Date, A-Date, Agent를 나타내는 테이블입니다.
    Vessel D-Date A-Date Agent
    Ever Strong 07/10 08/01 HMM
    Wide Hotel 07/11 08/08 HMM
    Starship Mercury 07/11 08/09 PIL Korea
  • BUSAN POTI

    선박운항스케줄 목록 - 선박운항스케줄목록으로 Vessel, D-Date, A-Date, Agent를 나타내는 테이블입니다.
    Vessel D-Date A-Date Agent
    Northern Monument 07/13 08/28 SEA LEAD SHIPPING
    Msc Ditte 07/25 09/30 MSC Korea
    Express Berlin 07/29 09/13 SEA LEAD SHIPPING
출발항
도착항
광고 문의
뉴스제보
포워딩 콘솔서비스(포워딩 전문업체를 알려드립니다.)
자유게시판
추천사이트
인터넷신문

BUSAN OSAKA

선박명 항차번호 출항일 도착항 도착일 Line Agent
x

스케줄 검색은 유료서비스입니다.
유료서비스를 이용하시면 더 많은 스케줄과
다양한 정보를 보실 수 있습니다.

로그인